Structural adjustment intervention for seismic improvement of the town hall.
The works carried out concerned:
work of refurbishment and strengthening with decontamination, reinforcement and reshaping of the sections in reinforced concrete already present at the base of the building
seismic insulation at the base of the building with the installation of seismic-insulating systems
strengthening of the masonry
reinforcement of reinforced concrete elements with metallic hooping (metallic carpentry)